baseline dates meaning in English
基线日期
Examples
- Displays baseline dates , work , and costs
显示比较基准的日期、工时和成本。 - List of tasks with scheduled start and finish dates , baseline start and finish dates , and differences between scheduled and baseline dates
任务列表,包括排定的开始日期、排定的完成日期、比较基准开始日期、比较基准完成日期以及排定日期与比较基准日期之间的差异 - Slippage can occur when a baseline plan is set and the actual dates subsequently entered for tasks are later than the baseline dates or the actual durations are longer than the baseline durations
设置了比较基准后,如果输入的任务实际日期比基准日期晚,或者实际工期长于比较基准工期时,则发生进度落后。